Nuie Square Right Hand 1500 x 850mm Shower Bath

Nuie Square Right Hand 1500 x 850mm Shower Bath

Nuie

Code: WBS1585R

£ 301.95 (INC. VAT)

Quantity
Stock Status
Check In Stock
Delivery
NextDayDeliveryWhite Estimated 2 - 4 Working Days
Delivery From:   £34.99
Product Description

This Nuie Square Right Hand 1500 x 850mm Shower Bath has an eye-catching L-Shaped design.

This designer bath is part of the premium Nuie Bath Collection. This bath has been constructed out of high-quality acrylic material and has a right-handed fitment. This particular type of bath is a "Shower Bath", providing a relaxing bathing area with generous room for showering. The shower bath has plenty of optional extras, including various screens, front panels and end panels available from the drop-down menus. The bath comes undrilled, allowing customisation for bath fillers, taps and wastes.

Additionally, this luxurious bath has a length of 1500mm, a width is 850mm, and a depth is 390mm, making it ideal for a comfortable soaking experience. Finally, the Nuie bath comes complete with a 5-year manufacturer's guarantee providing peace of mind when purchasing.

The Nuie Square Right Hand 1500 x 850mm Shower Bath Features:

  • Modern Shower Bath
  • Squared L-Shape design
  • Optional panels & screens are available (see drop-down menu)
  • Premium Acrylic material
  • Easy installation
  • Right-handed fitment
  • Undrilled bath
  • Leg set supplied
  • Length: 1500mm
  • Width: 850mm
  • Depth: 390mm
  • Weight: 27kg
  • Bath Thickness: 4mm
  • Water Capacity: 156L
  • Authorised Stockist of Nuie
  • 5 Year Manufacturers Guarantee
Specification

Specification Table

Brand Name Nuie
Range Shower Baths
Description 1500mm Right Hand Square Shower Bath
Category Baths
Type Square Shower Baths
Style Contemporary
Features And Benefits
  • Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option
  • Designed and built to the highest quality
  • Sanitary Grade Acrylic
  • Un-drilled
  • Supplied with leg set
  • Bath panels sold separately
  • Finish White
    Displaced Capacity 200
    Bath Volume 200
    No Of Tapholes 0
    Includes Waste No
    Barcode Code 5056211822288
    Product Weight (KG) 27
    Product Width 850
    Product Depth 390
    Product Length 1500
    Questions (1)
    1 Questions 1 Answers
    Showing all 1 questions Ask a question
    Q: How thick is this bath? Chris - 2 years ago Answer: This L-Shaped Shower Bath is 4mm in thickness.
    Guarantee

    Nuie 5 Year Guarantee

    This item is covered by a 5-Year Manufacturer's Guarantee from Nuie Bathrooms who are part of the Roxor Group.

    The Roxor Group Contact Details: (Tel: 01422 417110 Email: sales@roxorgroup.com)

    Roxors's Guarantee, Aftercare and Returns Policy

    Delivery and Returns Information

    Delivery Information

    For quick and reliable deliveries of goods, we use a variety of services, from reliable and trustworthy couriers to direct deliveries from the manufacturer's warehouse. We deliver items across the majority of England with areas of Scotland & Wales at a premium price depending upon the location and item purchased. See full details on our delivery & shipping information.

    Delivery Frequently Asked Questions (FAQs)

    If I use the delivery option to order Next Day during the weekend (Saturday or Sunday), will I receive it on Monday?
    Unfortunately not. Orders are processed and delivered during working days (Mon-Fri not including bank holidays). In order to receive an item on a Monday, if using the Next Working Day option, it must be ordered before the stated time (either 12pm or 3pm) on the Friday. Orders placed after (12pm or 3pm as stated, or at weekends, will be processed the next working day. Next working day deliveries do not include weekends; orders placed on Friday before 12pm or 3pm (as stated for express delivery) will be delivered the following working day (Monday – Excluding bank holidays). Orders placed after 12pm or 3pm (as stated on the Express Delivery option) on a Friday will be processed the next working day (Monday – Excluding bank holidays) and delivered on Tuesday.
    Do you deliver on a Saturday?
    Our delivery service delivers on working days only (Monday, Tuesday, Wednesday, Thursday and Friday, excluding Bank Holidays). We offer Next Working Day Delivery - but please note that if the order is placed after 12pm or 3pm (item dependent) on a Thursday and before 12pm or 3pm (item dependent) on a Friday - this will not be delivered until the Monday. We offer working day delivery only. By calling the office on 01472 242159 - it may be possible for some products to be upgraded to a Saturday delivery.
    What if I am not home when the delivery arrives?
    In some cases, deliveries may be attempted with a neighbour of left in a safe place. You can leave special instructions when you place your order online of what to do, or if your order is already placed, please call or e-mail us and we can assist further.
    Can I order an item that is currently out of stock?
    Yes, to place an order for an item out of stock, please call 01472 242159 and we can place an order over the phone for you.
    Can my delivery be left with a neighbour if I am not in?
    In most cases, deliveries can be left with neighbours. You can leave special instructions when you place your order online of your preferred neighbour, or if your order is already placed, please e-mail us on info@showerstoyou.co.uk or call on 01472 242159
    Can I change my existing order?
    Providing your order has not been dispatched by our warehouse; changes usually can be made, please call our sales team on 01472 242159 and we can look into your order.
    What to do if my delivery hasn’t arrived?
    If you have not received your delivery, if you have had notification from the carrier regarding delivery, you can contact the carrier directly to assist, or call or e-mail us directly, and we can look into this and assist.
    Can I choose a delivery date?
    In some cases, we may be able to work with the delivery carrier/the warehouse to arrange a specific date for delivery in advance. To discuss this, please call the sales team on 01472 242159 who an look into this for you.
    Can I collect from your Warehouse?
    Items can be collected from our warehouse, however, please contact our sales team on 01472 242159 to discuss the collection, as some stock may not be available for immediate collection and require stock transfer.
    I have missed my delivery, what shall I do?
    If you have received notice from DX or APC regarding a missed delivery, then deliveries can usually be arranged online on their website using your consignment numbers. For any other missed deliveries please contact our customer support team on 01472 242159, who can discuss this with you.

    Returns, Refunds & Damages

    • 14 day return policy on uninstalled products
    • All items to be returned in their original packaging
    • All damage must be reported within 48hours
    • To initiate a return, refund or replacement please e-mail info@showerstoyou.co.uk with your order number, date and name so that we can advise on the process
    (Collection/Shipping Charges may apply)