Nuie Acrylic 1700mm Gloss White L Shape Shower Bath Front Panel
Code: WBS300
£ 91.30 (INC. VAT)
The Nuie Acrylic 1700mm Gloss White L-Shape Shower Bath Front Panel is a high-quality front bath panel designed to add a touch of elegance and sophistication to your bathroom. This Nuie Bath Panel boasts a Gloss White finish, enhancing its sleek, modern appearance and is crafted from hard-wearing acrylic. Specifically designed for use with an L-shaped shower bath, it perfectly complements the contours and dimensions of your Nuie Bath, ensuring a seamless fit.
The front bath panel measures 500mm in height, 1695mm in width, and 167mm in depth, making it an ideal size for many standard L-shaped baths. Its durable construction ensures longevity, while the Gloss White finish adds a bright, clean look to your bathroom. This panel is an excellent choice for anyone who upgrades their bathroom with a stylish, practical solution that combines durability with contemporary design. Inclusive of a 5-year manufacturer's guarantee for peace of mind when ordering.
*Images are for illustrative purposes only. Please refer to the specifications below.
The Nuie Acrylic 1700mm Gloss White L-Shape Shower Bath Front Panel Features:
- High-quality front bath panel
- Hard-wearing Acrylic construction
- Gloss White finish
- Straightforward to install
- For use with L-shaped shower baths
- It is ideal for a Nuie Bathtub.
- Height: 500mm
- Width: 1695mm
- Depth: 167mm
- Authorised Nuie Stockist
- 5-Year Manufacturer's Guarantee
| Brand Name | Nuie |
| Range | Bath Panels |
| Description | Shower Bath Front Panel (1700mm) |
| Category | Baths |
| Type | Square Shower Bath Panels |
| Style | Contemporary |
| Features And Benefits |
|
| Finish | White |
| Barcode Code | 5055369083596 |
| Product Weight (KG) | 3.4 |
| Product Width | 500 |
| Product Depth | 167 |
| Product Length | 1695 |
| Packaged Weight | 3.4 |
| Packaging Length | 47 |
| Packaging Width | 1015 |
| Packaging Height | 555 |
Nuie 5 Year Guarantee
This item is covered by a 5-Year Manufacturer's Guarantee from Nuie Bathrooms who are part of the Roxor Group.
The Roxor Group Contact Details: (Tel: 01422 417110 Email: sales@roxorgroup.com)
Delivery Information
For quick and reliable deliveries of goods, we use a variety of services, from reliable and trustworthy couriers to direct deliveries from the manufacturer's warehouse. We deliver items across the majority of England with areas of Scotland & Wales at a premium price depending upon the location and item purchased. See full details on our delivery & shipping information.
Delivery Frequently Asked Questions (FAQs)
| If I use the delivery option to order Next Day during the weekend (Saturday or Sunday), will I receive it on Monday? |
| Unfortunately not. Orders are processed and delivered during working days (Mon-Fri not including bank holidays). In order to receive an item on a Monday, if using the Next Working Day option, it must be ordered before the stated time (either 12pm or 3pm) on the Friday. Orders placed after (12pm or 3pm as stated, or at weekends, will be processed the next working day. Next working day deliveries do not include weekends; orders placed on Friday before 12pm or 3pm (as stated for express delivery) will be delivered the following working day (Monday – Excluding bank holidays). Orders placed after 12pm or 3pm (as stated on the Express Delivery option) on a Friday will be processed the next working day (Monday – Excluding bank holidays) and delivered on Tuesday. |
| Do you deliver on a Saturday? |
|
Our delivery service delivers on working days only (Monday, Tuesday, Wednesday, Thursday and Friday, excluding Bank Holidays). We offer Next Working Day Delivery - but please note that if the order is placed after 12pm or 3pm (item dependent) on a Thursday and before 12pm or 3pm (item dependent) on a Friday - this will not be delivered until the Monday. We offer working day delivery only. By calling the office on 01472 242159 - it may be possible for some products to be upgraded to a Saturday delivery. |
| What if I am not home when the delivery arrives? |
| In some cases, deliveries may be attempted with a neighbour of left in a safe place. You can leave special instructions when you place your order online of what to do, or if your order is already placed, please call or e-mail us and we can assist further. |
| Can I order an item that is currently out of stock? |
| Yes, to place an order for an item out of stock, please call 01472 242159 and we can place an order over the phone for you. |
| Can my delivery be left with a neighbour if I am not in? |
| In most cases, deliveries can be left with neighbours. You can leave special instructions when you place your order online of your preferred neighbour, or if your order is already placed, please e-mail us on info@showerstoyou.co.uk or call on 01472 242159 |
| Can I change my existing order? |
| Providing your order has not been dispatched by our warehouse; changes usually can be made, please call our sales team on 01472 242159 and we can look into your order. |
| What to do if my delivery hasn’t arrived? |
| If you have not received your delivery, if you have had notification from the carrier regarding delivery, you can contact the carrier directly to assist, or call or e-mail us directly, and we can look into this and assist. |
| Can I choose a delivery date? |
| In some cases, we may be able to work with the delivery carrier/the warehouse to arrange a specific date for delivery in advance. To discuss this, please call the sales team on 01472 242159 who an look into this for you. |
| Can I collect from your Warehouse? |
| Items can be collected from our warehouse, however, please contact our sales team on 01472 242159 to discuss the collection, as some stock may not be available for immediate collection and require stock transfer. |
| I have missed my delivery, what shall I do? |
| If you have received notice from DX or APC regarding a missed delivery, then deliveries can usually be arranged online on their website using your consignment numbers. For any other missed deliveries please contact our customer support team on 01472 242159, who can discuss this with you. |
Returns, Refunds & Damages
- 14 day return policy on uninstalled products
- All items to be returned in their original packaging
- All damage must be reported within 48hours
- To initiate a return, refund or replacement please e-mail info@showerstoyou.co.uk with your order number, date and name so that we can advise on the process
